Build Instructions for: Green Giant
by: thedoctorpepper
File Format: RCT 1 (no expansions)
Ride Type: Suspended Single-Rail (RCT1)
Vehicle Type:
Operating Mode:
Track Segments (Total): 65
Segment Number Type
11Middle station (1)
21End station (1)
3-42Left curve [R2] (1)
51Level to up [chain lift] (1 to 2)
61Up [chain lift] (2 to 3)
71Up [chain lift] (3 to 4)
81Up [chain lift] (4 to 5)
91Up [chain lift] (5 to 6)
101Up [chain lift] (6 to 7)
111Up [chain lift] (7 to 8)
121Up [chain lift] (8 to 9)
131Up [chain lift] (9 to 10)
141Up to level [chain lift] (10)
151Level to down (10 to 9)
161Down to level (9)
171Left curve [R2] (9)
181Left curve [R3] (9)
191Level to down (9 to 8)
201Down (8 to 7)
211Down (7 to 6)
221Down to level (6)
23-242Left curve [R2] (6)
251Level to down (6 to 5)
261Down to level (5)
27-282Right curve [R2] (5)
291Level to up (5 to 6)
301Up (6 to 7)
311Up to level (7)
321Right curve [R3] (7)
331Level to down (7 to 6)
341Down (6 to 5)
351Down (5 to 4)
361Down to level (4)
37-382Left curve [R2] (4)
391Level (4)
401Left curve [R2] (4)
411Level to down (4 to 3)
421Down (3 to 2)
431Down (2 to 1)
441Down to level (1)
451Level to up (1 to 2)
461Up (2 to 3)
471Up to level (3)
48-492Right curve [R2] (3)
501Level to down (3 to 2)
511Down (2 to 1)
521Down to level (1)
53-542Left curve [R2] (1)
551Ess bend left (1)
561Left curve [R3] (1)
571Level (1)
581Left curve [R3] (1)
59-602Level (1)
611Begin station (1)
62-654Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.